Google
 

Friday, July 27, 2007

KPE (Kallang-Paya Lebar Expressway : East to North

'071026
Opens in part, complete by next year.

ERP Gantry, op if speed <>10 mins, halved (luckily not down to zero as 9 km on ground, not jus 6 ft, underground).

Links to PIE, ECP, TPE

Ponggol direct to city

MCE to Marina IR and Fin Cte, links ECP to AYE, by 2013, construction start 4Q next yr.

Nearby Barrage, water will be discharged if reservoir flooded.

w3.kpeunderground.sg

Saturday, July 14, 2007

The Ultimate Driving Experience Of A Licensed Driver But Not A Formula1 One ...

Pl note, below done in a manner that is practical, do not go over the limits:

Braking to a halt just behind the car in front.

Moving across several lanes in the shortest time.

Doing 3-point turn on the narrowest steepest and busy road.

Accelerating ahead, then immediately changing lane.
Google
 

What would you like to be featured on this blog?